Image released by ENGIE with its India solar commissioning announcement. Photo: ENGIE.
October 29, 2026: ENGIE has brought two solar projects into full operation in India, adding 450 MW to its operating portfolio in the country.
The larger asset is the 250 MW Khaba project in Barmer, Rajasthan, built through Khaba Renewable Energy Private Limited, a wholly owned ENGIE subsidiary. It is expected to generate about 650 GWh a year and avoid nearly 180 kilotonnes of CO₂ emissions.
The second is a 200 MW plant in the Khavda Renewable Energy Park in the Rann of Kutch, Gujarat, developed through Enren II Energy Private Limited. It will supply Gujarat Urja Vikas Nigam Limited under a 25 year power purchase agreement and generate about 350 GWh a year.
About 80% of the construction workforce was hired locally, the company said. ENGIE now has around 2 GW in operation or under construction in India. It has also won its first storage projects here: a 280 MW / 560 MWh battery system in November 2025, and a hybrid of 200 MW solar with 100 MW / 600 MWh of storage in January 2026.
“India is a key growth market for ENGIE, where we are continuing to build scale and momentum as we contribute to one of the world’s major energy transitions,” said Pedro Vasconcelos, ENGIE Executive Vice President in charge of Renewable & Flexible Power. “As the market evolves, we also see increasing opportunities in corporate PPAs and in combining renewable generation with more sophisticated energy management and flexibility solutions.”
Market Research Outlook’s View
On ENGIE’s own estimates, Khaba will produce about 2,600 kWh per kW a year against 1,750 at Khavda. That is 49% more power from the same megawatt. In solar, where a project is built shapes its earnings as much as its contract does.
The quote points to where ENGIE sees growth next: corporate PPAs and flexible supply. For large industrial power users, that means another well funded seller competing for their contracts. Watch whether ENGIE’s next India deal is a corporate PPA.
